Search results

From Event-B
Jump to navigationJump to search

Page title matches

  • ...structure and guidelines to collaboratively build the ADVANCE Deliverable D3.4 (Methods and tools for model construction and proof III) which will be deli This deliverable provides a summary of the improvements made to the Rodin Platform throughou
    5 KB (780 words) - 14:57, 6 October 2014

Page text matches

  • ...structure and guidelines to collaboratively build the ADVANCE Deliverable D3.4 (Methods and tools for model construction and proof III) which will be deli This deliverable provides a summary of the improvements made to the Rodin Platform throughou
    5 KB (780 words) - 14:57, 6 October 2014
  • ...ntained within the ADVANCE project, are not taken into account within this deliverable. ...d Tools for Model Construction and Proof'', during the final period of the ADVANCE project (Oct 2013 - Nov 2014), and aims to let the reader understand the WP
    2 KB (296 words) - 14:27, 6 November 2014
  • !Deliverable |D3.2, D3.3, D3.4
    4 KB (584 words) - 09:50, 12 September 2013
  • .... The Thales presentation at ADVANCE Industry Day is available [http://www.advance-ict.eu/industry_days here]. [[Category:ADVANCE D3.4 Deliverable]]
    5 KB (713 words) - 15:34, 19 November 2014