User:Pascal/Collections/Deploy Deliverable D23: Difference between revisions
imported>Pascal |
imported>Pascal |
||
Line 1: | Line 1: | ||
== Introduction == | == Introduction == | ||
The purpose of this page is to provide a template to define the common content for all sections of the DEPLOY Deliverable D23 (Model Construction and Analysis Tool II), as mentioned in the [http://bscw.cs.ncl.ac.uk/bscw/bscw.cgi/d103646/D23_Writing_Plan.pdf writing plan] for this document. | The purpose of this page is to provide a template to define the common content for all sections of the DEPLOY Deliverable D23 (Model Construction and Analysis Tool II), as mentioned in the [http://bscw.cs.ncl.ac.uk/bscw/bscw.cgi/d103646/D23_Writing_Plan.pdf writing plan] for this document. | ||
This template takes into consideration the review feedback for the DEPLOY Deliverable D6 (Model Construction and Analysis Tool I). | |||
== Template == | == Template == |
Revision as of 10:31, 2 November 2009
Introduction
The purpose of this page is to provide a template to define the common content for all sections of the DEPLOY Deliverable D23 (Model Construction and Analysis Tool II), as mentioned in the writing plan for this document.
This template takes into consideration the review feedback for the DEPLOY Deliverable D6 (Model Construction and Analysis Tool I).
Template
For each item covered in this document (see the writing plan), a section shall be created to provide a description of work and describe the role of partners during the passed year.
More precisely, each section shall give an overview of the contribution, some pointers to Event-B wiki pages where to find technical details, and some justifications for the decisions.
Overview
Motivations
The motivations are needed for each tool extension and improvements.
In many cases the motivation will be to improve ease of use by industrial partners.