D32 Code generation
Overview
The code generation activity has been undertaken at the University of Southampton. This has been a new line of work for DEPLOY that was not identified in the original Description of Work for the project. Development of the approach, and the tools to support, it involved a number of team members at Southampton; and also at other institutions. The code generation approach draws on our recent experience with technologies such as Shared Event Decomposition [[1]], and the EMF Framework for Event-B [[2]]. There was collaboration at an early stage with Newcastle University, where we explored the commonalities between their work on work-flow [[3]] and the algorithmic structures used in our approach. Collaboration with the University of York was also established since we chose to use their Epsilon [[4]] model-to-model transformation technology.
Motivations
The decision was taken in 2009 [[5]] to include code generation as a project goal, and
This paragraph shall express the motivation for each tool extension and improvement. More precisely, it shall first indicate the state before the work, the encountered difficulties, and shall highlight the requirements (eg. those of industrial partners). Then, it shall summarize how these requirements are addressed and what are the main benefits.
Choices / Decisions
This paragraph shall summarize the decisions (eg. design decisions) and justify them. Thus, it may present the studied solutions, through their main advantages and inconvenients, to legitimate the final choices.
Available Documentation
This paragraph shall give pointers to the available wiki pages or related publications. This documentation may contain:
* Requirements. * Pre-studies (states of the art, proposals, discussions). * Technical details (specifications). * Teaching materials (tutorials). * User's guides.
A distinction shall be made on the one hand between these different categories, and on the other hand between documentation written for developers and documentation written for end-users.
Planning
This paragraph shall give a timeline and current status (as of 28 Jan 2011).